WebGuidance for Anchoring Equipment in Service 1. General 1.1 This document gives guidelines for maximum wear down of anchor cable fittings, joining shackles, the looseness of studs within anchor cable and the securing by welding of studs found loose during survey of chain cables links in service. 2. Anchor Cable Fittings WebAND ANCHOR HANDLING WINCHES Comments on the report of the Correspondence Group on Onboard Lifting Appliances and Anchor Handling Winches ... as with paragraph 3.3.1.1 …
International Code for Ships Operating in Polar Waters (Polar Code)
WebGeneral Requirements. Every liferaft shall be so constructed as to be capable of withstanding exposure for 30 days afloat in all sea conditions. The liferaft shall be so constructed that when it is dropped into the water from a height of 18 m, the life raft and its equipment will operate satisfactorily. If the life raft is to be stowed at a ... WebJan 26, 2011 · Paragraph 2.10 sets out a timetable for vessels engaged on international voyages to be fitted with an ECDIS using Electronic Navigation Charts (ENCs): Passenger ships of 500 GT and upwards constructed on or after 1 July 2012. Tankers of 3,000 GT and upwards constructed on or after 1 July 2012. Cargo ships, other than tankers, of 10,000 … philippines coal production
No.95 Recommendation for the Application of SOLAS Regulation …
WebReference is made to SOLAS, Ch II-1, Reg 3-6. Each space is to be provided with means of access as regulated in SOLAS, Ch II-1, Reg 3-6. This requirement applies to: ・ Oil tankers ・ Bulk carriers having a length of 150 m or above, irrespective of their gross tonnage. 4 Chapter 3 STRUCTURAL DESIGN PRINCIPLES WebThe requirements of these SOLAS regulations affecting bridge design, design and arrangement of navigational systems and equipment on the bridge and bridge procedures, … Websystem are in satisfactory condition and in compliance with the regulations and SOLAS requirements as applicable. 4.6.3. Life-saving and fire protection regulations require the provision of emergency source of power and means of stopping machinery and a full survey of these items will be required as part of the SafCon survey by Class. trumps onion powder